By allowing ads to appear on this site, you support the local businesses who, in turn, support great journalism.
Lane closures on SR21 for signal inspections at the DDI
gdot

Contractors for the Georgia Department of Transportation will install lane closures on SR 21 in both directions between Hendley Road and SR 30 in Port Wentworth.

These closures will be utilized for traffic signal inspections and are scheduled from 10 a.m. until 2 p.m., Wednesday, May 3, weather permitting.

These temporary lane closures are necessary for the contractor to complete the existing interchange to a diverging diamond interchange to improve traffic.

This is a WORK ZONE and extreme caution is necessary.

Motorists are advised to reduce speeds as they travel through this and all work zones.

Message signs, barrels and/or cones will be utilized to alert the public of the upcoming changes.

Drivers should be aware that personnel and equipment will be operating in close proximity to travel lanes.